Commit Graph

229 Commits

Author SHA1 Message Date
king b5be26089d feat(project): meeting task table kept per week, titled "N주차 작업 등록"
- localStorage key now includes the week start; each week shows only its own rows
- Old per-person rows move into the current week the first time it is opened
- Heading shows the week number; help + docs; jsdom tests

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-12 15:09:54 +09:00
king ee09e8bfd1 feat(project): move whole meeting sections up/down from the 구분 column
- 구분 cell: right-click or ⋯ menu → 구역 위로 / 구역 아래로 / 구역 끝에 줄 추가
- POST /api/goals/meeting-items/{id}/move-section swaps the contiguous section block
  with its neighbour under the meeting lock (row order and merges follow; 409 after completion)
- Next meetings inherit the new order; help + docs; tests (DB-less, real PostgreSQL, jsdom)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-12 13:29:53 +09:00
king 89ad338024 fix(project): review fixes — access leaks, open paths, save safety, concurrency
- Subproject tasks via parent /tasks are re-filtered by current access (FULL/READ kept)
- PUT /api/projects/order: every id must be manageable; bad/duplicate ids -> 400, all-or-nothing
- Inbox, web alert popup, PC notifier open tasks via /project/t/{id}; embed=1 survives redirect;
  old /p/{home}?task= redirects READ users to the linked project
- Project page / snapshot / workload include the opened archived or sub project only
- Alerts: DB-side filters + oldest-first paging (no 50-row cut); badges counted without caps;
  my tasks keep every open task (completed capped)
- Meeting results: next-week meeting open, or own meeting open when no next meeting;
  header edits + result checks under row locks (FOR UPDATE / FOR SHARE)
- Inbox panel waits for the task window save (same retry/discard flow) before switching/closing;
  read failures stay unread
- Attachment upload removes only its own file on DB failure
- New project modal: create once, retry only failed member assignments
- update_task / update_project: locked-row validation in one transaction; completion hints from real transition
- Creator added as explicit member when another owner is chosen
- _once lock lifetime managed by refcount (no leak on failure)
- Section default assignee must still be a registered project user; follower add uses can_assign
- Docs (PROJECT_MODULE 6-15, help), tests (DB-less, real PostgreSQL, jsdom, Chrome)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-12 11:08:56 +09:00
king 8045d06362 feat(project): click-to-open inbox, 세부 작업 terms, board link copy
- Inbox lists only unread notifications / unchecked mentions; no
  [확인] button: clicking a row marks it (and same-task rows) seen and
  opens the task side panel; picking another row switches the panel and
  removes the previously seen rows; closing removes them too
- Project module wording: 하위 작업 -> 세부 작업, 작업 추가 -> 메인 작업 추가;
  dashboard workload bars "메인 작업" / "세부 작업"
- Meeting: link icon next to 회의록 보드 copies the board URL
- Bump project asset versions

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-08 16:02:58 +09:00
king 11e9803965 feat(project): asana icons, 12-col colors, bold sections, all-view menu, desc text color/size
- Project edit modal: color palette 12 columns; icon tabs [기본 아이콘] /
  [아사나 아이콘] (33 filled icons, value "asana:<name>", 6KB subset font
  material-symbols-asana.woff2)
- Section names bold (board column, list group, rename input)
- Inbox: clicking the left inbox area closes the task side panel
- Replace top-right scope toggle with admin-only sidebar "전체 보기"
  (?scope=all, switches in place on project pages)
- Description editor: text color and size; server keeps only validated
  color / font-size on plain spans (desc_inline_style)
- Fix goals_meeting_ui [2e] for manual monthly target; bump asset versions

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-08 13:22:35 +09:00
king d7d4f61bfb feat(project): move PC notifier entry into inbox header
Sidebar 'PC 알림' item removed; inbox header gets a [PC 알림] button,
and the notifier page keeps the inbox highlighted with a breadcrumb.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-08 11:13:27 +09:00
king 06af036f86 feat(project): PC tray notifier for mentions and assignments
Windows tray app (desktop/notifier, C# .NET Framework 4.8 WinForms,
single exe, no installer/admin) that shows the same big alert popup as
the web even when the browser is in the background: layered topmost
window that does not steal focus, blinking border, open/close actions,
sound, autostart toggle, DPAPI-encrypted token.

Server side (project_db migration 023):
- notifier_links / notifier_tokens (SHA-256 hashes only)
- device link flow: link/start -> browser approve at /project/notifier
  -> link/poll issues token once
- Bearer API for alerts/read/logout reusing _alerts_payload; token
  re-checks current user record and project permission each call
- /project/notifier page (approve, connected PCs, revoke, download)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-08 10:21:58 +09:00
king 701f43a1f8 feat(project): manual monthly sales target with weekly diff
Week target popup now has its own "month total" input at the top; the
monthly target is saved as entered instead of being the sum of weeks.
Bottom shows week sum and diff (month target - week sum), colored
for remaining / over / even. Requests without `month` (stale cached JS)
still fall back to the week sum.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-08 09:20:07 +09:00
king 5278d568de feat(project): weekly meetings editable by anyone, admin completes to lock
Meeting write APIs now accept any project user; deleting a meeting and the
new POST /api/goals/meetings/{week}/complete (complete/reopen) stay admin
only. A completed meeting (migration 022: completed_at, completed_by)
rejects edits with 409; last-week result fields follow the next meeting's
lock instead. The page shows a complete button / locked badge.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 17:37:23 +09:00
king 21fc78adb9 feat(project): blinking popup for new mentions and task assignments
Project pages poll GET /api/notifications/alerts every 20s (and when the
tab becomes visible). New unread mention/assigned notifications show in a
large blinking popup at the bottom center until closed; closing in one tab
closes it in the others. A new browser starts from the latest id.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 17:30:15 +09:00
king 6959941128 feat(project): delete registered tasks from the meeting task table
Registered rows get a delete button that, after confirmation, deletes the
task from its project (trash). Unapplied rows get an x to drop the row.
Registered rows now stay in the browser list so they can be deleted later.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 16:56:57 +09:00
king 28d56fc3c5 fix(project): member dialog grows to fit everyone instead of scrolling
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 16:53:18 +09:00
king a0722f26ca feat(project): meeting numbers in sales unit, member add/remove, quick-task polish
- Header numbers use the goal table sales unit (e.g. 백만원); exact won
  amounts in tooltips.
- Notes title: 결정사항 : 진행상황 수시 공유 및 완료 되어야 함.
- Member dialog shows current members checked: check to add, uncheck to
  remove (owner locked); member APIs also require project access.
- Quick task table: centered bold headers, assignee shown as avatar + name.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 16:50:42 +09:00
king da27c9990a feat(project): meeting header with plan, notes and quick task table
Three header areas that stay visible while the table scrolls:
month plan with the four numbers in one compact line, decisions/notes,
and a task table (title, assignee, project, section) whose cells open
pick lists; Apply creates the task in that project.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 16:24:23 +09:00
king 569b33ece4 fix(project): workload bars fill by completion rate, not task count
Bar height was scaled to the largest count, so 9/13 looked nearly empty
and 1/1 short. Each bar is now the whole set; green fill = done ratio,
with count and percent above.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 14:43:21 +09:00
king 1cfcec2bef feat(project): workload as vertical bars with task list drawer
Per assignee, main and subtask bars (height = count, green = done).
Clicking a bar slides in a right-side panel listing those tasks;
clicking an item opens the task editor. Closing the editor refreshes
the counts. Subtask summary API now returns id, title, due date.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 14:24:02 +09:00
king fc3a2d0b9b feat(project): dashboard workload by assignee with subtasks and completion
Replace the scheduled-tasks bar chart with a table of all tasks assigned
per person in scope (no due date needed, filters ignored): main tasks,
subtasks (new GET /api/projects/{id}/subtasks-summary), done counts and
completion rate, plus a total row. Admin only, as before.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 14:09:06 +09:00
king 8b664fc216 style(project): pastel PowerPoint colors for meeting board button
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 13:58:14 +09:00
king c9d5e6e017 feat(project): meeting board button opens a blank Google Slides deck
A "회의록 보드" button next to attendees opens the week's Google Slides
deck in its own window. The deck is found (Drive appProperties) or
created in the shared drive MEETING_BOARD_FOLDER_ID as one BLANK slide,
named like "10월 2주차 (10/5~10/11)". Needs a token with Drive and
Slides scopes; the authorize script now requests them.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 12:04:09 +09:00
king 38d0a87d6b feat(project): show weekday and day count in weekly target popup
Each week reads like "11/1(일)~11/8(일) 8일".

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 11:30:49 +09:00
king cd3577b299 feat(project): month-bounded meeting weeks, weekly sales targets, sticky header
- Weeks stay inside the month: week 1 starts on the 1st (through the next
  Sunday if the 1st is a weekend); a trailing Mon/Tue joins the last week.
  "Last week" is the previous period.
- Prev-week review columns: 전주 업무 | 결과(text, new result_note) |
  전주 목표 | 결과(amount).
- Header now shows month target, cumulative weekly target, month-to-date
  sales and gap (amount + %), with decisions/notes beside it; the area
  stays fixed while scrolling.
- Goals board: the monthly sales target is entered per week; the sum
  becomes the month target.
- Migration 020: result_note, goal_week_targets, drop Monday-only check,
  move absorbed Monday meetings to the new week start.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 11:24:41 +09:00
king e958743e65 feat(project): rename meeting columns and drop rate/evaluation
Headers: 주요 업무 / 결과 / 전주 목표 / 정량 목표. The achievement-rate
and evaluation columns are removed from the weekly meeting table.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-06 17:27:04 +09:00
king 39dcda66b4 feat(project): remove per-row this-week sales in weekly meetings
Drop the "이번주 실적" line under each row's target and the now-unused
shop link menu. Performance sales stay only in the header cards.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-06 16:01:47 +09:00
king df36a5a917 feat(project): drop auto last-week results in weekly meetings
Last-week result is always entered by hand; remove shop sales auto-fill
and the 자동입력 / 실적 미사용 badges next to item names. This-week sales
under the target stay.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-06 15:52:05 +09:00
king 86622cc4dd fix(project): retain monthly plan text styles 2026-10-04 13:30:36 +09:00
king ed7da57066 feat(project): compact links and add file icons 2026-10-04 13:17:22 +09:00
king e2fc14a584 fix(project): center weekly meeting labels 2026-10-03 18:45:27 +09:00
king d89875db7e fix(project): restore smooth quarter toggles
Hide monthly content until column widths settle to prevent numeric shifts during expansion.
2026-10-03 18:09:10 +09:00
king 321bf11f65 fix(project): stop quarter reveal numeric drift 2026-10-03 17:53:16 +09:00
king 3e4c6dfad3 fix(project): center annual goal labels 2026-10-03 17:18:32 +09:00
king 090e508bf3 feat(project): add meeting cell editing
Apply project_db migration 019 to enable vertical cell merges. Other cell editing remains available before migration.
2026-10-03 15:11:41 +09:00
king 193da56edf fix(project): fit meeting rows and inline badges 2026-10-03 14:26:36 +09:00
king 7647e4b20f feat(project): add cell moves and width menus 2026-10-03 08:55:15 +09:00
king 2c8542339d fix(project): fit goal rows to text height 2026-10-03 07:59:22 +09:00
king 36a6866b96 style(project): compact toolbar and reset icon 2026-10-03 06:29:50 +09:00
king db39d3b383 fix(project): anchor toolbar above selected cell 2026-10-03 06:23:03 +09:00
king dc2008c5b3 feat(project): add Excel font controls and reflow 2026-10-03 05:47:57 +09:00
king 494d84f7c2 feat(project): add group collapse and UI polish 2026-10-03 05:26:41 +09:00
king 44f6ca4ef7 style(project): reduce board column and card corner radius 2026-10-02 18:02:40 +09:00
king 7f9c7a24d3 style(project): change board column background to ececec 2026-10-02 17:58:19 +09:00
king 22af196d56 feat(project): add Asana-style board completion checks 2026-10-02 17:55:31 +09:00
king 20232baf06 feat(project): add font options and selected goal text formatting
Restore the board header add button to the task side panel while keeping footer quick entry. Add safe, persisted goal text formatting and self-hosted Project font preferences with shared help updates and regression coverage.
2026-10-02 17:28:54 +09:00
king 035cb83d6f feat(project): add inline board tasks and reorder subtasks 2026-10-02 16:38:01 +09:00
king 114af59b26 fix(project): show completed subtasks with filled green checks 2026-10-02 16:13:52 +09:00
king 6a38fdb06a feat(project): match Asana typography sizes and weights 2026-10-02 16:03:52 +09:00
king d387048ebf feat(project): apply Asana system fonts to Project screens
Override the font token only on Project pages, preserve icon and monospace fonts, and update CSS/JS cache versions. Match the image viewer font stack as well.
2026-10-02 15:15:46 +09:00
king 968892d811 feat(project): 회의록 이번주↔지난주 순서 바꾸기(사람별 기억), 목표 줄·영역 바로 추가, 보드 카드 100px·표지 이미지
- 주간 회의록: 표 왼쪽 위 [순서 바꾸기] — 이번주(2칸)·지난주 리뷰(5칸) 묶음 순서 교체, 로그인 이메일별로 브라우저에 기억
- 연간 목표: 업무 영역 추가·줄 추가(1열·2열 메뉴)는 이름을 묻지 않고 바로 만들고 새 이름 칸을 바로 입력 상태로
- 보드 카드: 높이 100px 고정(제목 2줄까지), 담당자·날짜 글자·아이콘 10% 크게,
  설명의 첫 이미지를 카드 위 표지로(아사나식)
- project.css/js 캐시 버전 올림

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-02 11:38:27 +09:00
king a3a9444c3b feat(project): 설명란 이미지 더블클릭 = 별도 창 보기, 댓글 Shift+Enter 줄바꿈, 메뉴 이름 Project
- 설명란 이미지 더블클릭 → 별도 브라우저 창(원본 크기, 휠 확대·축소, 끌어서 이동, −/+ · 1:1 · 맞춤 막대, 키 + − 0 1 Esc)
- 댓글 입력칸·댓글 대화창·답글 입력칸을 여러 줄 입력칸으로 — Enter 등록, Shift+Enter 줄바꿈, 줄 수만큼 늘어남
- ERP 메뉴·홈 카드 이름 "프로젝트 관리" → "Project"
- project.css/js 캐시 버전 올림

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-02 10:50:30 +09:00
king e1006c63de fix(project): 목표·주간 회의록 저장 손실·지난주 연결·실적 미확인 수정 (점검 9건)
- 칸별 자동 저장 createFieldSaver: 같은 칸 요청 직렬화, 보낸 값만 saved,
  늦은 응답이 새 초안을 덮지 않음, 실패 시 초안·dirty 유지(빨간 테두리),
  localStorage 초안 백업·되살리기, 페이지 떠남 keepalive + 이탈 경고
- 목표 표: 저장 실패면 영역·줄·병합 작업과 표 교체 중단, 받는 사이 입력 보호
- 회의록: 금주 목표 저장 뒤 새로고침 대신 숫자 칸만 다시(차례 번호로 옛 응답 버림),
  이번주 실적 %는 서버 확정 목표로 즉시 재계산
- 지난주 = 정확히 7일 전 주의 같은 연결키 줄(line_key, 마이그레이션 018),
  역순 생성·이름 변경·삭제 후 재생성에도 연결, 이름 추정 연결 없음
- 실적 조회 장애를 0원 대신 미확인으로(목록·매출·부분 실패 구분)
- 구역·항목 ⋮ 메뉴 버튼(키보드·터치), 메뉴 키보드 탐색·포커스 복귀
- 매출 갱신 실패·일부 실패 안내 + 재시도, 서버 기록 갱신 시각, 권한 없으면 호출 안 함
- 테스트: Python 통합(역순 생성·실적 장애), 018 백필, jsdom UI 106건

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 21:14:10 +09:00
king 21981eb946 style(project): 연간 목표 분기 구분 — 분기별 색 띠·열 음영, 접기 아이콘은 엑셀식 −/+
- 분기마다 차분한 색(파랑·청록·보라·남색): 머리 위 색 띠(월 3px · 분기 6px), 분기 열 전체 옅은 음영,
  분기 칸 오른쪽 2px 경계, 분기 머리 글자·아이콘은 분기 색
- 접기 아이콘: 네모 안 −(펼침) / +(접힘), 90° 돌며 세로 막대가 자라고 줄어드는 애니메이션
- project.css 캐시 버전 올림

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 17:39:32 +09:00