Meeting write APIs now accept any project user; deleting a meeting and the
new POST /api/goals/meetings/{week}/complete (complete/reopen) stay admin
only. A completed meeting (migration 022: completed_at, completed_by)
rejects edits with 409; last-week result fields follow the next meeting's
lock instead. The page shows a complete button / locked badge.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Project pages poll GET /api/notifications/alerts every 20s (and when the
tab becomes visible). New unread mention/assigned notifications show in a
large blinking popup at the bottom center until closed; closing in one tab
closes it in the others. A new browser starts from the latest id.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Registered rows get a delete button that, after confirmation, deletes the
task from its project (trash). Unapplied rows get an x to drop the row.
Registered rows now stay in the browser list so they can be deleted later.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Header numbers use the goal table sales unit (e.g. 백만원); exact won
amounts in tooltips.
- Notes title: 결정사항 : 진행상황 수시 공유 및 완료 되어야 함.
- Member dialog shows current members checked: check to add, uncheck to
remove (owner locked); member APIs also require project access.
- Quick task table: centered bold headers, assignee shown as avatar + name.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Three header areas that stay visible while the table scrolls:
month plan with the four numbers in one compact line, decisions/notes,
and a task table (title, assignee, project, section) whose cells open
pick lists; Apply creates the task in that project.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Bar height was scaled to the largest count, so 9/13 looked nearly empty
and 1/1 short. Each bar is now the whole set; green fill = done ratio,
with count and percent above.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Per assignee, main and subtask bars (height = count, green = done).
Clicking a bar slides in a right-side panel listing those tasks;
clicking an item opens the task editor. Closing the editor refreshes
the counts. Subtask summary API now returns id, title, due date.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Replace the scheduled-tasks bar chart with a table of all tasks assigned
per person in scope (no due date needed, filters ignored): main tasks,
subtasks (new GET /api/projects/{id}/subtasks-summary), done counts and
completion rate, plus a total row. Admin only, as before.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
A "회의록 보드" button next to attendees opens the week's Google Slides
deck in its own window. The deck is found (Drive appProperties) or
created in the shared drive MEETING_BOARD_FOLDER_ID as one BLANK slide,
named like "10월 2주차 (10/5~10/11)". Needs a token with Drive and
Slides scopes; the authorize script now requests them.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Weeks stay inside the month: week 1 starts on the 1st (through the next
Sunday if the 1st is a weekend); a trailing Mon/Tue joins the last week.
"Last week" is the previous period.
- Prev-week review columns: 전주 업무 | 결과(text, new result_note) |
전주 목표 | 결과(amount).
- Header now shows month target, cumulative weekly target, month-to-date
sales and gap (amount + %), with decisions/notes beside it; the area
stays fixed while scrolling.
- Goals board: the monthly sales target is entered per week; the sum
becomes the month target.
- Migration 020: result_note, goal_week_targets, drop Monday-only check,
move absorbed Monday meetings to the new week start.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Headers: 주요 업무 / 결과 / 전주 목표 / 정량 목표. The achievement-rate
and evaluation columns are removed from the weekly meeting table.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Drop the "이번주 실적" line under each row's target and the now-unused
shop link menu. Performance sales stay only in the header cards.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Last-week result is always entered by hand; remove shop sales auto-fill
and the 자동입력 / 실적 미사용 badges next to item names. This-week sales
under the target stay.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Restore the board header add button to the task side panel while keeping footer quick entry. Add safe, persisted goal text formatting and self-hosted Project font preferences with shared help updates and regression coverage.
Override the font token only on Project pages, preserve icon and monospace fonts, and update CSS/JS cache versions. Match the image viewer font stack as well.
- 주간 회의록: 표 왼쪽 위 [순서 바꾸기] — 이번주(2칸)·지난주 리뷰(5칸) 묶음 순서 교체, 로그인 이메일별로 브라우저에 기억
- 연간 목표: 업무 영역 추가·줄 추가(1열·2열 메뉴)는 이름을 묻지 않고 바로 만들고 새 이름 칸을 바로 입력 상태로
- 보드 카드: 높이 100px 고정(제목 2줄까지), 담당자·날짜 글자·아이콘 10% 크게,
설명의 첫 이미지를 카드 위 표지로(아사나식)
- project.css/js 캐시 버전 올림
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 칸별 자동 저장 createFieldSaver: 같은 칸 요청 직렬화, 보낸 값만 saved,
늦은 응답이 새 초안을 덮지 않음, 실패 시 초안·dirty 유지(빨간 테두리),
localStorage 초안 백업·되살리기, 페이지 떠남 keepalive + 이탈 경고
- 목표 표: 저장 실패면 영역·줄·병합 작업과 표 교체 중단, 받는 사이 입력 보호
- 회의록: 금주 목표 저장 뒤 새로고침 대신 숫자 칸만 다시(차례 번호로 옛 응답 버림),
이번주 실적 %는 서버 확정 목표로 즉시 재계산
- 지난주 = 정확히 7일 전 주의 같은 연결키 줄(line_key, 마이그레이션 018),
역순 생성·이름 변경·삭제 후 재생성에도 연결, 이름 추정 연결 없음
- 실적 조회 장애를 0원 대신 미확인으로(목록·매출·부분 실패 구분)
- 구역·항목 ⋮ 메뉴 버튼(키보드·터치), 메뉴 키보드 탐색·포커스 복귀
- 매출 갱신 실패·일부 실패 안내 + 재시도, 서버 기록 갱신 시각, 권한 없으면 호출 안 함
- 테스트: Python 통합(역순 생성·실적 장애), 018 백필, jsdom UI 106건
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 분기마다 차분한 색(파랑·청록·보라·남색): 머리 위 색 띠(월 3px · 분기 6px), 분기 열 전체 옅은 음영,
분기 칸 오른쪽 2px 경계, 분기 머리 글자·아이콘은 분기 색
- 접기 아이콘: 네모 안 −(펼침) / +(접힘), 90° 돌며 세로 막대가 자라고 줄어드는 애니메이션
- project.css 캐시 버전 올림
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 보드: 하위 작업이 없는 카드에도 하위 작업 토글(카드 hover 때 보임) — 누르면 펼쳐지며 바로 이름 입력 줄
- 연간 목표: 분기 머리 칸 아무 곳이나 눌러 접기/펴기(너비 조절 직후 클릭은 무시),
꺽쇠 대신 SVG →|← / ←|→ 아이콘, 화살표가 반 바퀴 돌며 바뀜, 접힌 분기 머리는 강조색
- 회의록 작은 달력: 회의록 있음 점을 달력 테두리 안으로
- project.css/js 캐시 버전 올림
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
연간 목표 표
- 3·6·9·12월 오른쪽에 1~4분기 칸(글 칸 13=1분기·15=2분기·14=3분기·16=4분기 — 예전 반기 칸 번호를 이어 써서
글 옮기기 없음, 예전 상반기 글은 1분기·하반기 글은 3분기에 보임)
- 분기 합계·달성률·로아스 가중 평균, 분기 접기(pj_goal_fold_q), 열 너비 키 q1~q4
- 가로 병합은 같은 분기 월 칸 안에서만(서버·화면·DB CHECK), 분기를 넘는 예전 병합은 잘라서 그림
- 마이그레이션 017: goal_cells 월 칸 0~16, 분기를 넘는 병합은 분기 끝까지로 줄임(글 유지),
회의록 줄 이름 "메타(숫자)" → "메타". 미적용이면 2·4분기 칸 읽기 전용 + 503
주간 회의록
- 달력 폭 줄이고(174px) 글자·칸 5% 키움, 주차 탭은 달력 바로 왼쪽
- 지난주 리뷰 머리에 지난주 기간, "목표 금액" → "정량 목표", "목표 표에서 보기" 삭제
- 첫 회의록 기본 줄 "메타(숫자)" → "메타"
도움말·문서·테스트 갱신, project.css/js 캐시 버전 올림
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 주차 탭: 한 줄짜리(1주차 10/5~11, 같은 달이면 끝 월 생략, 전체 기간은 말풍선), 회의록 있음 점은 왼쪽 위
- 이 달 계획 카드를 머리 왼쪽(주차 탭 자리)으로 옮겨 너비를 달력 앞까지
- 작은 달력 212px → 191px(글자·칸 높이도 같이)
- project.css 캐시 버전 올림
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 연간 목표 표의 그 달 열 글을 업무 영역별 카드로 표시(router._month_plan) — 빈 칸 제외,
가로 병합 칸 글은 범위(9~10월) 표시, 묶인 줄은 묶음 항목 이름, 목표 표 미적용이면 숨김
- 머리 숫자 9칸을 한 줄 막대(.pj-meet-kpibar)로 — 값 15px, 설명 문구는 말풍선
- project.css 캐시 버전 올림
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 연간 열 sticky(left = 1열 + 2열 너비), 경계 그림자 — 머리·지표(틀 고정 줄)·업무 영역 칸 모두
- 매출 달성률 연간·상·하반기 = 입력된 실적 합계 ÷ 그 기간 목표 합계 전체(예: 2,910 ÷ 3,313 = 87.8%),
예전 '실적이 있는 달의 목표만' 기준에서 변경, 말풍선 "연간 목표 합계 대비 실적"
- 캐시 버전 20261001v, 문서 갱신
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- .erp-page:has(> .pj-wrap / .pjh) 위 여백 24px → 6px, .pj-wrap·제목 줄(.pj-section-head·회의록 머리) 위 여백 0
- 다른 모듈의 .erp-page 여백은 그대로, 캐시 버전 20261001u, 문서 갱신
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 자유 입력 칸 대신 멤버 칩(사진·이름·×) + [참석자] 고르기 창(찾기·전원 선택·모두 해제·체크), 바뀔 때마다 저장
- 후보 = project 권한 보유 등록 사용자(_meet_members), 저장은 이메일 쉼표 목록(예전 글자는 칩으로 유지, _parse_attendees)
- 참석자 길이 제한 500 → 3000자, 캐시 버전 20261001t, 문서 갱신
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>