Meeting write APIs now accept any project user; deleting a meeting and the
new POST /api/goals/meetings/{week}/complete (complete/reopen) stay admin
only. A completed meeting (migration 022: completed_at, completed_by)
rejects edits with 409; last-week result fields follow the next meeting's
lock instead. The page shows a complete button / locked badge.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Registered rows get a delete button that, after confirmation, deletes the
task from its project (trash). Unapplied rows get an x to drop the row.
Registered rows now stay in the browser list so they can be deleted later.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Header numbers use the goal table sales unit (e.g. 백만원); exact won
amounts in tooltips.
- Notes title: 결정사항 : 진행상황 수시 공유 및 완료 되어야 함.
- Member dialog shows current members checked: check to add, uncheck to
remove (owner locked); member APIs also require project access.
- Quick task table: centered bold headers, assignee shown as avatar + name.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Three header areas that stay visible while the table scrolls:
month plan with the four numbers in one compact line, decisions/notes,
and a task table (title, assignee, project, section) whose cells open
pick lists; Apply creates the task in that project.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The role select (member/manager) had no effect on permissions; every
assigned member can view and edit the project. Remove it from the
assign dialog and avatar tooltip; new assignments are always member.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Registration was blocked whenever same-model candidates existed, so a
second monitor of the same model (e.g. dual monitors) could not be added.
Now only an existing asset with the same serial blocks a new one; the
UI tells serial and model candidates apart and hides 'register' only
for serial matches.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Bar height was scaled to the largest count, so 9/13 looked nearly empty
and 1/1 short. Each bar is now the whole set; green fill = done ratio,
with count and percent above.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Per assignee, main and subtask bars (height = count, green = done).
Clicking a bar slides in a right-side panel listing those tasks;
clicking an item opens the task editor. Closing the editor refreshes
the counts. Subtask summary API now returns id, title, due date.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Admins no longer see projects they are not owner/member of: sidebar list,
project list API, project pages, search, inbox, notifications, reminders
and trash all follow access.visible_project_ids. Only the super admin
still sees every project. Member assignment stays admin-only.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Replace the scheduled-tasks bar chart with a table of all tasks assigned
per person in scope (no due date needed, filters ignored): main tasks,
subtasks (new GET /api/projects/{id}/subtasks-summary), done counts and
completion rate, plus a total row. Admin only, as before.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Goal text cells no longer get move borders or drag handling; clicking a
cell still highlights it. The weekly meeting table keeps its move.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
A "회의록 보드" button next to attendees opens the week's Google Slides
deck in its own window. The deck is found (Drive appProperties) or
created in the shared drive MEETING_BOARD_FOLDER_ID as one BLANK slide,
named like "10월 2주차 (10/5~10/11)". Needs a token with Drive and
Slides scopes; the authorize script now requests them.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The weekly meeting table always starts with "fit all columns" instead of
the widths saved in the browser; it refits once fonts load unless the
user already resized a column.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Target and result cells accept text such as "20개". Values that parse
as amounts still go to the integer columns; anything else goes to the
new target_text/result_text columns (migration 021).
- Fix: PUT /api/goals/meeting-items/{id} dropped result_note, so the
last-week result text was never saved.
- Update meeting nav test to the month-bounded week numbering.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Weeks stay inside the month: week 1 starts on the 1st (through the next
Sunday if the 1st is a weekend); a trailing Mon/Tue joins the last week.
"Last week" is the previous period.
- Prev-week review columns: 전주 업무 | 결과(text, new result_note) |
전주 목표 | 결과(amount).
- Header now shows month target, cumulative weekly target, month-to-date
sales and gap (amount + %), with decisions/notes beside it; the area
stays fixed while scrolling.
- Goals board: the monthly sales target is entered per week; the sum
becomes the month target.
- Migration 020: result_note, goal_week_targets, drop Monday-only check,
move absorbed Monday meetings to the new week start.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Headers: 주요 업무 / 결과 / 전주 목표 / 정량 목표. The achievement-rate
and evaluation columns are removed from the weekly meeting table.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Drop the "이번주 실적" line under each row's target and the now-unused
shop link menu. Performance sales stay only in the header cards.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Last-week result is always entered by hand; remove shop sales auto-fill
and the 자동입력 / 실적 미사용 badges next to item names. This-week sales
under the target stay.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Restore the board header add button to the task side panel while keeping footer quick entry. Add safe, persisted goal text formatting and self-hosted Project font preferences with shared help updates and regression coverage.
- 상자마다 무게 칸 = 상자에 든 제품 수량 × 포장무게(설정(제품명)의 지금 값) 합계, 상자번호처럼 상자 단위 한 칸
- 무게가 없는 제품이 섞이면 아는 무게만 더하고 "일부 미입력"(말풍선에 빠진 코드), 모두 없으면 —
- 상자 목록 엑셀에도 무게(g) 열(혼합 상자는 세로 병합)
- 포장무게 칸(마이그레이션 007)이 없으면 무게 칸·열 없이 예전 그대로
- tests/test_cupang_weight.py: 상자 무게 계산 + 엑셀 무게 열
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- cupang_products.weight_g (마이그레이션 007, NULL = 미입력, 0~1,000,000 CHECK)
- 초기 무게 39건 시드(cupang_products_weight_seed.sql) — 무게가 비어 있는 행만 채움, 실행 전 값 백업
- 수기 추가에 포장무게(g) 칸(1,070·1070g 허용, 비우면 기존 무게 유지), 수정 팝업에서 수정·지우기
- 등록 목록에 포장무게 열(1,070g, 숫자 정렬, 무게 없는 줄은 맨 뒤)
- 007 미적용이면 무게 칸·열을 숨기고 저장 SQL 에서도 뺌(기존 동작 그대로)
- tests/test_cupang_weight.py: 입력 읽기 + 무게 칸 유무별 등록·수정 SQL
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 주간 회의록: 표 왼쪽 위 [순서 바꾸기] — 이번주(2칸)·지난주 리뷰(5칸) 묶음 순서 교체, 로그인 이메일별로 브라우저에 기억
- 연간 목표: 업무 영역 추가·줄 추가(1열·2열 메뉴)는 이름을 묻지 않고 바로 만들고 새 이름 칸을 바로 입력 상태로
- 보드 카드: 높이 100px 고정(제목 2줄까지), 담당자·날짜 글자·아이콘 10% 크게,
설명의 첫 이미지를 카드 위 표지로(아사나식)
- project.css/js 캐시 버전 올림
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 칸별 자동 저장 createFieldSaver: 같은 칸 요청 직렬화, 보낸 값만 saved,
늦은 응답이 새 초안을 덮지 않음, 실패 시 초안·dirty 유지(빨간 테두리),
localStorage 초안 백업·되살리기, 페이지 떠남 keepalive + 이탈 경고
- 목표 표: 저장 실패면 영역·줄·병합 작업과 표 교체 중단, 받는 사이 입력 보호
- 회의록: 금주 목표 저장 뒤 새로고침 대신 숫자 칸만 다시(차례 번호로 옛 응답 버림),
이번주 실적 %는 서버 확정 목표로 즉시 재계산
- 지난주 = 정확히 7일 전 주의 같은 연결키 줄(line_key, 마이그레이션 018),
역순 생성·이름 변경·삭제 후 재생성에도 연결, 이름 추정 연결 없음
- 실적 조회 장애를 0원 대신 미확인으로(목록·매출·부분 실패 구분)
- 구역·항목 ⋮ 메뉴 버튼(키보드·터치), 메뉴 키보드 탐색·포커스 복귀
- 매출 갱신 실패·일부 실패 안내 + 재시도, 서버 기록 갱신 시각, 권한 없으면 호출 안 함
- 테스트: Python 통합(역순 생성·실적 장애), 018 백필, jsdom UI 106건
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 분기마다 차분한 색(파랑·청록·보라·남색): 머리 위 색 띠(월 3px · 분기 6px), 분기 열 전체 옅은 음영,
분기 칸 오른쪽 2px 경계, 분기 머리 글자·아이콘은 분기 색
- 접기 아이콘: 네모 안 −(펼침) / +(접힘), 90° 돌며 세로 막대가 자라고 줄어드는 애니메이션
- project.css 캐시 버전 올림
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 보드: 하위 작업이 없는 카드에도 하위 작업 토글(카드 hover 때 보임) — 누르면 펼쳐지며 바로 이름 입력 줄
- 연간 목표: 분기 머리 칸 아무 곳이나 눌러 접기/펴기(너비 조절 직후 클릭은 무시),
꺽쇠 대신 SVG →|← / ←|→ 아이콘, 화살표가 반 바퀴 돌며 바뀜, 접힌 분기 머리는 강조색
- 회의록 작은 달력: 회의록 있음 점을 달력 테두리 안으로
- project.css/js 캐시 버전 올림
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>