- New "작업" column (migration 026 parent_task_id): empty = new task in the section,
chosen task = register as its subtask (candidates = open main tasks of that section)
- Server validates the task belongs to the project, clears it when the project changes,
and rejects apply if the chosen task was deleted/moved
- Removed the in-table subtask rows (hover button, Tab/Shift+Tab, right-click) from UI/API
- Registered row title opens the task editor on the right (iframe ?embed=1, waits for the
task window to save before switching/closing, like the inbox panel)
- Help + docs (DEPLOYMENT 026); tests (real PostgreSQL, jsdom)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Subtask rows (one level, parent_id): hover button / right-click to add, Tab to make a row the
subtask of the row above, Shift+Tab to move it back; inherits the parent's project, no section
- Apply on a subtask row creates the task under the parent row's task (server-checked)
- "크게 열기" moves the same table into a wide window (same rows and saves), Esc/x to close
- Server: PUT parent_id with one-level rules; add rejects grandchildren
- Help + docs; tests (real PostgreSQL rules + parent apply, jsdom rows/Tab/wide view)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Cause: the table lived only in each browser's localStorage
- project_db migration 025 goal_meeting_tasks (week_start, parent_id for subtask rows, task_id)
- API list/add/update/delete + apply; apply locks the row and creates the task once via the
same helper as the task window (_create_task_for: membership, assignee check, notifications)
- Non-members see other people's rows with project/section/task hidden; only member projects
can be picked; completed meeting is read-only (409)
- Client saves per field, refreshes every 30s / on focus, uploads rows left in this browser once
- Docs (DEPLOYMENT 025, PROJECT_MODULE, help, CLAUDE.md); tests (real PostgreSQL incl. 4
concurrent applies -> one task, jsdom)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Project picker skips status=completed; section picker skips is_done_stage
- Auto-selected first section skips done sections
- Help + docs; jsdom test data covers both
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- localStorage key now includes the week start; each week shows only its own rows
- Old per-person rows move into the current week the first time it is opened
- Heading shows the week number; help + docs; jsdom tests
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Notice body uses the task description editor (createDescEditor, shared toolbar partial
project/_desc_fmtbar.html): bold/italic/underline/strike, text color/size, lists, checklist,
quote, link, clear format, image button/paste with resize; images upload to /notice/api/images
- Show date uses the project date popup (enhanceDateInput) plus a time field
- Recipients rendered like the project member picker (icon + name + check)
- project.js exposes window.PJLib; PJ_LIB_ONLY runs only shared tooltips on non-project pages
- Centered notice renders checklist/quote/list styles outside project pages too
- Task window editor behavior unchanged (jsdom + Chrome regressions pass)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Hover tips: keep above the cursor even near the top edge (tighter tail gap); flip below only
when there is no room, 28px under the cursor so the pointer never covers the text
- Meeting task table: "new project" (Pro user+) and "new section" at the top of the pickers,
created by name and selected right away
- Help + docs; jsdom tests
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 구분 cell: right-click or ⋯ menu → 구역 위로 / 구역 아래로 / 구역 끝에 줄 추가
- POST /api/goals/meeting-items/{id}/move-section swaps the contiguous section block
with its neighbour under the meeting lock (row order and merges follow; 409 after completion)
- Next meetings inherit the new order; help + docs; tests (DB-less, real PostgreSQL, jsdom)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Subproject tasks via parent /tasks are re-filtered by current access (FULL/READ kept)
- PUT /api/projects/order: every id must be manageable; bad/duplicate ids -> 400, all-or-nothing
- Inbox, web alert popup, PC notifier open tasks via /project/t/{id}; embed=1 survives redirect;
old /p/{home}?task= redirects READ users to the linked project
- Project page / snapshot / workload include the opened archived or sub project only
- Alerts: DB-side filters + oldest-first paging (no 50-row cut); badges counted without caps;
my tasks keep every open task (completed capped)
- Meeting results: next-week meeting open, or own meeting open when no next meeting;
header edits + result checks under row locks (FOR UPDATE / FOR SHARE)
- Inbox panel waits for the task window save (same retry/discard flow) before switching/closing;
read failures stay unread
- Attachment upload removes only its own file on DB failure
- New project modal: create once, retry only failed member assignments
- update_task / update_project: locked-row validation in one transaction; completion hints from real transition
- Creator added as explicit member when another owner is chosen
- _once lock lifetime managed by refcount (no leak on failure)
- Section default assignee must still be a registered project user; follower add uses can_assign
- Docs (PROJECT_MODULE 6-15, help), tests (DB-less, real PostgreSQL, jsdom, Chrome)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- app.store: role "pro" (ROLES, ROLE_LABELS); admin page grade select
Admin / Pro user / User, super admin fixed to one account.
- project.access: role_of, is_pro, is_project_admin.
- router: _require_admin -> _require_pro (goals, meetings complete/delete,
members, reorder, trash restore, assignable users); new project and
project edit/owner change need Pro user+; task delete open to any member;
project/section delete = Admin+ or creator; comment edit/delete of others
and workload summary = Pro user+. Templates get pj_pro / pj_admin.
- Weekly meeting table first header "구역" -> "구분".
- Docs (CLAUDE.md, PROJECT_MODULE 6-14, overview, help page) and tests.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
subtasks-summary now returns every level under the scope's main tasks
(recursive CTE, depth <= 20) with root_task_id and parent_title; the
dashboard groups by root_task_id. Also fix drawer header '세부 작업 작업'.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Inbox lists only unread notifications / unchecked mentions; no
[확인] button: clicking a row marks it (and same-task rows) seen and
opens the task side panel; picking another row switches the panel and
removes the previously seen rows; closing removes them too
- Project module wording: 하위 작업 -> 세부 작업, 작업 추가 -> 메인 작업 추가;
dashboard workload bars "메인 작업" / "세부 작업"
- Meeting: link icon next to 회의록 보드 copies the board URL
- Bump project asset versions
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Project edit modal: color palette 12 columns; icon tabs [기본 아이콘] /
[아사나 아이콘] (33 filled icons, value "asana:<name>", 6KB subset font
material-symbols-asana.woff2)
- Section names bold (board column, list group, rename input)
- Inbox: clicking the left inbox area closes the task side panel
- Replace top-right scope toggle with admin-only sidebar "전체 보기"
(?scope=all, switches in place on project pages)
- Description editor: text color and size; server keeps only validated
color / font-size on plain spans (desc_inline_style)
- Fix goals_meeting_ui [2e] for manual monthly target; bump asset versions
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
If the user has a non-revoked notifier token seen in the last 3 minutes,
/api/notifications/alerts returns only the baseline with desktop=true;
the web marks it seen so alerts resume on the web after the app stops.
A failing check keeps the web popup.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Week target popup now has its own "month total" input at the top; the
monthly target is saved as entered instead of being the sum of weeks.
Bottom shows week sum and diff (month target - week sum), colored
for remaining / over / even. Requests without `month` (stale cached JS)
still fall back to the week sum.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Meeting write APIs now accept any project user; deleting a meeting and the
new POST /api/goals/meetings/{week}/complete (complete/reopen) stay admin
only. A completed meeting (migration 022: completed_at, completed_by)
rejects edits with 409; last-week result fields follow the next meeting's
lock instead. The page shows a complete button / locked badge.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Project pages poll GET /api/notifications/alerts every 20s (and when the
tab becomes visible). New unread mention/assigned notifications show in a
large blinking popup at the bottom center until closed; closing in one tab
closes it in the others. A new browser starts from the latest id.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Registered rows get a delete button that, after confirmation, deletes the
task from its project (trash). Unapplied rows get an x to drop the row.
Registered rows now stay in the browser list so they can be deleted later.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Header numbers use the goal table sales unit (e.g. 백만원); exact won
amounts in tooltips.
- Notes title: 결정사항 : 진행상황 수시 공유 및 완료 되어야 함.
- Member dialog shows current members checked: check to add, uncheck to
remove (owner locked); member APIs also require project access.
- Quick task table: centered bold headers, assignee shown as avatar + name.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Three header areas that stay visible while the table scrolls:
month plan with the four numbers in one compact line, decisions/notes,
and a task table (title, assignee, project, section) whose cells open
pick lists; Apply creates the task in that project.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The role select (member/manager) had no effect on permissions; every
assigned member can view and edit the project. Remove it from the
assign dialog and avatar tooltip; new assignments are always member.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Bar height was scaled to the largest count, so 9/13 looked nearly empty
and 1/1 short. Each bar is now the whole set; green fill = done ratio,
with count and percent above.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Per assignee, main and subtask bars (height = count, green = done).
Clicking a bar slides in a right-side panel listing those tasks;
clicking an item opens the task editor. Closing the editor refreshes
the counts. Subtask summary API now returns id, title, due date.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Replace the scheduled-tasks bar chart with a table of all tasks assigned
per person in scope (no due date needed, filters ignored): main tasks,
subtasks (new GET /api/projects/{id}/subtasks-summary), done counts and
completion rate, plus a total row. Admin only, as before.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Goal text cells no longer get move borders or drag handling; clicking a
cell still highlights it. The weekly meeting table keeps its move.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
A "회의록 보드" button next to attendees opens the week's Google Slides
deck in its own window. The deck is found (Drive appProperties) or
created in the shared drive MEETING_BOARD_FOLDER_ID as one BLANK slide,
named like "10월 2주차 (10/5~10/11)". Needs a token with Drive and
Slides scopes; the authorize script now requests them.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Target and result cells accept text such as "20개". Values that parse
as amounts still go to the integer columns; anything else goes to the
new target_text/result_text columns (migration 021).
- Fix: PUT /api/goals/meeting-items/{id} dropped result_note, so the
last-week result text was never saved.
- Update meeting nav test to the month-bounded week numbering.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Weeks stay inside the month: week 1 starts on the 1st (through the next
Sunday if the 1st is a weekend); a trailing Mon/Tue joins the last week.
"Last week" is the previous period.
- Prev-week review columns: 전주 업무 | 결과(text, new result_note) |
전주 목표 | 결과(amount).
- Header now shows month target, cumulative weekly target, month-to-date
sales and gap (amount + %), with decisions/notes beside it; the area
stays fixed while scrolling.
- Goals board: the monthly sales target is entered per week; the sum
becomes the month target.
- Migration 020: result_note, goal_week_targets, drop Monday-only check,
move absorbed Monday meetings to the new week start.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Headers: 주요 업무 / 결과 / 전주 목표 / 정량 목표. The achievement-rate
and evaluation columns are removed from the weekly meeting table.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Drop the "이번주 실적" line under each row's target and the now-unused
shop link menu. Performance sales stay only in the header cards.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Last-week result is always entered by hand; remove shop sales auto-fill
and the 자동입력 / 실적 미사용 badges next to item names. This-week sales
under the target stay.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Restore the board header add button to the task side panel while keeping footer quick entry. Add safe, persisted goal text formatting and self-hosted Project font preferences with shared help updates and regression coverage.
Override the font token only on Project pages, preserve icon and monospace fonts, and update CSS/JS cache versions. Match the image viewer font stack as well.
- 주간 회의록: 표 왼쪽 위 [순서 바꾸기] — 이번주(2칸)·지난주 리뷰(5칸) 묶음 순서 교체, 로그인 이메일별로 브라우저에 기억
- 연간 목표: 업무 영역 추가·줄 추가(1열·2열 메뉴)는 이름을 묻지 않고 바로 만들고 새 이름 칸을 바로 입력 상태로
- 보드 카드: 높이 100px 고정(제목 2줄까지), 담당자·날짜 글자·아이콘 10% 크게,
설명의 첫 이미지를 카드 위 표지로(아사나식)
- project.css/js 캐시 버전 올림
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>