If the user has a non-revoked notifier token seen in the last 3 minutes,
/api/notifications/alerts returns only the baseline with desktop=true;
the web marks it seen so alerts resume on the web after the app stops.
A failing check keeps the web popup.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Sidebar 'PC 알림' item removed; inbox header gets a [PC 알림] button,
and the notifier page keeps the inbox highlighted with a breadcrumb.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Windows tray app (desktop/notifier, C# .NET Framework 4.8 WinForms,
single exe, no installer/admin) that shows the same big alert popup as
the web even when the browser is in the background: layered topmost
window that does not steal focus, blinking border, open/close actions,
sound, autostart toggle, DPAPI-encrypted token.
Server side (project_db migration 023):
- notifier_links / notifier_tokens (SHA-256 hashes only)
- device link flow: link/start -> browser approve at /project/notifier
-> link/poll issues token once
- Bearer API for alerts/read/logout reusing _alerts_payload; token
re-checks current user record and project permission each call
- /project/notifier page (approve, connected PCs, revoke, download)
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Week target popup now has its own "month total" input at the top; the
monthly target is saved as entered instead of being the sum of weeks.
Bottom shows week sum and diff (month target - week sum), colored
for remaining / over / even. Requests without `month` (stale cached JS)
still fall back to the week sum.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Meeting write APIs now accept any project user; deleting a meeting and the
new POST /api/goals/meetings/{week}/complete (complete/reopen) stay admin
only. A completed meeting (migration 022: completed_at, completed_by)
rejects edits with 409; last-week result fields follow the next meeting's
lock instead. The page shows a complete button / locked badge.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Registered rows get a delete button that, after confirmation, deletes the
task from its project (trash). Unapplied rows get an x to drop the row.
Registered rows now stay in the browser list so they can be deleted later.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Header numbers use the goal table sales unit (e.g. 백만원); exact won
amounts in tooltips.
- Notes title: 결정사항 : 진행상황 수시 공유 및 완료 되어야 함.
- Member dialog shows current members checked: check to add, uncheck to
remove (owner locked); member APIs also require project access.
- Quick task table: centered bold headers, assignee shown as avatar + name.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Three header areas that stay visible while the table scrolls:
month plan with the four numbers in one compact line, decisions/notes,
and a task table (title, assignee, project, section) whose cells open
pick lists; Apply creates the task in that project.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The role select (member/manager) had no effect on permissions; every
assigned member can view and edit the project. Remove it from the
assign dialog and avatar tooltip; new assignments are always member.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Registration was blocked whenever same-model candidates existed, so a
second monitor of the same model (e.g. dual monitors) could not be added.
Now only an existing asset with the same serial blocks a new one; the
UI tells serial and model candidates apart and hides 'register' only
for serial matches.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Bar height was scaled to the largest count, so 9/13 looked nearly empty
and 1/1 short. Each bar is now the whole set; green fill = done ratio,
with count and percent above.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Per assignee, main and subtask bars (height = count, green = done).
Clicking a bar slides in a right-side panel listing those tasks;
clicking an item opens the task editor. Closing the editor refreshes
the counts. Subtask summary API now returns id, title, due date.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Admins no longer see projects they are not owner/member of: sidebar list,
project list API, project pages, search, inbox, notifications, reminders
and trash all follow access.visible_project_ids. Only the super admin
still sees every project. Member assignment stays admin-only.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Replace the scheduled-tasks bar chart with a table of all tasks assigned
per person in scope (no due date needed, filters ignored): main tasks,
subtasks (new GET /api/projects/{id}/subtasks-summary), done counts and
completion rate, plus a total row. Admin only, as before.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Goal text cells no longer get move borders or drag handling; clicking a
cell still highlights it. The weekly meeting table keeps its move.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
A "회의록 보드" button next to attendees opens the week's Google Slides
deck in its own window. The deck is found (Drive appProperties) or
created in the shared drive MEETING_BOARD_FOLDER_ID as one BLANK slide,
named like "10월 2주차 (10/5~10/11)". Needs a token with Drive and
Slides scopes; the authorize script now requests them.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The weekly meeting table always starts with "fit all columns" instead of
the widths saved in the browser; it refits once fonts load unless the
user already resized a column.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Target and result cells accept text such as "20개". Values that parse
as amounts still go to the integer columns; anything else goes to the
new target_text/result_text columns (migration 021).
- Fix: PUT /api/goals/meeting-items/{id} dropped result_note, so the
last-week result text was never saved.
- Update meeting nav test to the month-bounded week numbering.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Weeks stay inside the month: week 1 starts on the 1st (through the next
Sunday if the 1st is a weekend); a trailing Mon/Tue joins the last week.
"Last week" is the previous period.
- Prev-week review columns: 전주 업무 | 결과(text, new result_note) |
전주 목표 | 결과(amount).
- Header now shows month target, cumulative weekly target, month-to-date
sales and gap (amount + %), with decisions/notes beside it; the area
stays fixed while scrolling.
- Goals board: the monthly sales target is entered per week; the sum
becomes the month target.
- Migration 020: result_note, goal_week_targets, drop Monday-only check,
move absorbed Monday meetings to the new week start.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Headers: 주요 업무 / 결과 / 전주 목표 / 정량 목표. The achievement-rate
and evaluation columns are removed from the weekly meeting table.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Drop the "이번주 실적" line under each row's target and the now-unused
shop link menu. Performance sales stay only in the header cards.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Last-week result is always entered by hand; remove shop sales auto-fill
and the 자동입력 / 실적 미사용 badges next to item names. This-week sales
under the target stay.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Restore the board header add button to the task side panel while keeping footer quick entry. Add safe, persisted goal text formatting and self-hosted Project font preferences with shared help updates and regression coverage.
- 상자마다 무게 칸 = 상자에 든 제품 수량 × 포장무게(설정(제품명)의 지금 값) 합계, 상자번호처럼 상자 단위 한 칸
- 무게가 없는 제품이 섞이면 아는 무게만 더하고 "일부 미입력"(말풍선에 빠진 코드), 모두 없으면 —
- 상자 목록 엑셀에도 무게(g) 열(혼합 상자는 세로 병합)
- 포장무게 칸(마이그레이션 007)이 없으면 무게 칸·열 없이 예전 그대로
- tests/test_cupang_weight.py: 상자 무게 계산 + 엑셀 무게 열
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- cupang_products.weight_g (마이그레이션 007, NULL = 미입력, 0~1,000,000 CHECK)
- 초기 무게 39건 시드(cupang_products_weight_seed.sql) — 무게가 비어 있는 행만 채움, 실행 전 값 백업
- 수기 추가에 포장무게(g) 칸(1,070·1070g 허용, 비우면 기존 무게 유지), 수정 팝업에서 수정·지우기
- 등록 목록에 포장무게 열(1,070g, 숫자 정렬, 무게 없는 줄은 맨 뒤)
- 007 미적용이면 무게 칸·열을 숨기고 저장 SQL 에서도 뺌(기존 동작 그대로)
- tests/test_cupang_weight.py: 입력 읽기 + 무게 칸 유무별 등록·수정 SQL
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- 주간 회의록: 표 왼쪽 위 [순서 바꾸기] — 이번주(2칸)·지난주 리뷰(5칸) 묶음 순서 교체, 로그인 이메일별로 브라우저에 기억
- 연간 목표: 업무 영역 추가·줄 추가(1열·2열 메뉴)는 이름을 묻지 않고 바로 만들고 새 이름 칸을 바로 입력 상태로
- 보드 카드: 높이 100px 고정(제목 2줄까지), 담당자·날짜 글자·아이콘 10% 크게,
설명의 첫 이미지를 카드 위 표지로(아사나식)
- project.css/js 캐시 버전 올림
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>