The role select (member/manager) had no effect on permissions; every
assigned member can view and edit the project. Remove it from the
assign dialog and avatar tooltip; new assignments are always member.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Registration was blocked whenever same-model candidates existed, so a
second monitor of the same model (e.g. dual monitors) could not be added.
Now only an existing asset with the same serial blocks a new one; the
UI tells serial and model candidates apart and hides 'register' only
for serial matches.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Bar height was scaled to the largest count, so 9/13 looked nearly empty
and 1/1 short. Each bar is now the whole set; green fill = done ratio,
with count and percent above.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Per assignee, main and subtask bars (height = count, green = done).
Clicking a bar slides in a right-side panel listing those tasks;
clicking an item opens the task editor. Closing the editor refreshes
the counts. Subtask summary API now returns id, title, due date.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Admins no longer see projects they are not owner/member of: sidebar list,
project list API, project pages, search, inbox, notifications, reminders
and trash all follow access.visible_project_ids. Only the super admin
still sees every project. Member assignment stays admin-only.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Replace the scheduled-tasks bar chart with a table of all tasks assigned
per person in scope (no due date needed, filters ignored): main tasks,
subtasks (new GET /api/projects/{id}/subtasks-summary), done counts and
completion rate, plus a total row. Admin only, as before.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Goal text cells no longer get move borders or drag handling; clicking a
cell still highlights it. The weekly meeting table keeps its move.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
A "회의록 보드" button next to attendees opens the week's Google Slides
deck in its own window. The deck is found (Drive appProperties) or
created in the shared drive MEETING_BOARD_FOLDER_ID as one BLANK slide,
named like "10월 2주차 (10/5~10/11)". Needs a token with Drive and
Slides scopes; the authorize script now requests them.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The weekly meeting table always starts with "fit all columns" instead of
the widths saved in the browser; it refits once fonts load unless the
user already resized a column.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Target and result cells accept text such as "20개". Values that parse
as amounts still go to the integer columns; anything else goes to the
new target_text/result_text columns (migration 021).
- Fix: PUT /api/goals/meeting-items/{id} dropped result_note, so the
last-week result text was never saved.
- Update meeting nav test to the month-bounded week numbering.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Weeks stay inside the month: week 1 starts on the 1st (through the next
Sunday if the 1st is a weekend); a trailing Mon/Tue joins the last week.
"Last week" is the previous period.
- Prev-week review columns: 전주 업무 | 결과(text, new result_note) |
전주 목표 | 결과(amount).
- Header now shows month target, cumulative weekly target, month-to-date
sales and gap (amount + %), with decisions/notes beside it; the area
stays fixed while scrolling.
- Goals board: the monthly sales target is entered per week; the sum
becomes the month target.
- Migration 020: result_note, goal_week_targets, drop Monday-only check,
move absorbed Monday meetings to the new week start.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Headers: 주요 업무 / 결과 / 전주 목표 / 정량 목표. The achievement-rate
and evaluation columns are removed from the weekly meeting table.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Drop the "이번주 실적" line under each row's target and the now-unused
shop link menu. Performance sales stay only in the header cards.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Last-week result is always entered by hand; remove shop sales auto-fill
and the 자동입력 / 실적 미사용 badges next to item names. This-week sales
under the target stay.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Restore the board header add button to the task side panel while keeping footer quick entry. Add safe, persisted goal text formatting and self-hosted Project font preferences with shared help updates and regression coverage.
Override the font token only on Project pages, preserve icon and monospace fonts, and update CSS/JS cache versions. Match the image viewer font stack as well.
- 상자마다 무게 칸 = 상자에 든 제품 수량 × 포장무게(설정(제품명)의 지금 값) 합계, 상자번호처럼 상자 단위 한 칸
- 무게가 없는 제품이 섞이면 아는 무게만 더하고 "일부 미입력"(말풍선에 빠진 코드), 모두 없으면 —
- 상자 목록 엑셀에도 무게(g) 열(혼합 상자는 세로 병합)
- 포장무게 칸(마이그레이션 007)이 없으면 무게 칸·열 없이 예전 그대로
- tests/test_cupang_weight.py: 상자 무게 계산 + 엑셀 무게 열
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>