Commit Graph

62 Commits

Author SHA1 Message Date
king da27c9990a feat(project): meeting header with plan, notes and quick task table
Three header areas that stay visible while the table scrolls:
month plan with the four numbers in one compact line, decisions/notes,
and a task table (title, assignee, project, section) whose cells open
pick lists; Apply creates the task in that project.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 16:24:23 +09:00
king e9be17faab fix(asset): allow registering a monitor of an already-registered model
Registration was blocked whenever same-model candidates existed, so a
second monitor of the same model (e.g. dual monitors) could not be added.
Now only an existing asset with the same serial blocks a new one; the
UI tells serial and model candidates apart and hides 'register' only
for serial matches.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 15:14:22 +09:00
king 569b33ece4 fix(project): workload bars fill by completion rate, not task count
Bar height was scaled to the largest count, so 9/13 looked nearly empty
and 1/1 short. Each bar is now the whole set; green fill = done ratio,
with count and percent above.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 14:43:21 +09:00
king 1cfcec2bef feat(project): workload as vertical bars with task list drawer
Per assignee, main and subtask bars (height = count, green = done).
Clicking a bar slides in a right-side panel listing those tasks;
clicking an item opens the task editor. Closing the editor refreshes
the counts. Subtask summary API now returns id, title, due date.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 14:24:02 +09:00
king b6dc82c0b3 feat(project): projects visible to members only, admins included
Admins no longer see projects they are not owner/member of: sidebar list,
project list API, project pages, search, inbox, notifications, reminders
and trash all follow access.visible_project_ids. Only the super admin
still sees every project. Member assignment stays admin-only.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 14:16:36 +09:00
king fc3a2d0b9b feat(project): dashboard workload by assignee with subtasks and completion
Replace the scheduled-tasks bar chart with a table of all tasks assigned
per person in scope (no due date needed, filters ignored): main tasks,
subtasks (new GET /api/projects/{id}/subtasks-summary), done counts and
completion rate, plus a total row. Admin only, as before.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 14:09:06 +09:00
king b7c24c07e7 feat(project): remove drag-to-move for annual goal cells
Goal text cells no longer get move borders or drag handling; clicking a
cell still highlights it. The weekly meeting table keeps its move.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 14:02:51 +09:00
king 46dc038e26 fix(project): show OAuth error code when meeting board token refresh fails
RefreshError showed only a generic message; include Google's error code
and explain client ID/secret mismatch (unauthorized_client).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 12:59:33 +09:00
king c9d5e6e017 feat(project): meeting board button opens a blank Google Slides deck
A "회의록 보드" button next to attendees opens the week's Google Slides
deck in its own window. The deck is found (Drive appProperties) or
created in the shared drive MEETING_BOARD_FOLDER_ID as one BLANK slide,
named like "10월 2주차 (10/5~10/11)". Needs a token with Drive and
Slides scopes; the authorize script now requests them.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 12:04:09 +09:00
king 3045944200 feat(project): auto-fit all meeting columns on load
The weekly meeting table always starts with "fit all columns" instead of
the widths saved in the browser; it refits once fonts load unless the
user already resized a column.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 11:43:53 +09:00
king 9528f735b8 feat(project): allow text in meeting target/result cells; fix result note save
- Target and result cells accept text such as "20개". Values that parse
  as amounts still go to the integer columns; anything else goes to the
  new target_text/result_text columns (migration 021).
- Fix: PUT /api/goals/meeting-items/{id} dropped result_note, so the
  last-week result text was never saved.
- Update meeting nav test to the month-bounded week numbering.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 11:40:30 +09:00
king 38d0a87d6b feat(project): show weekday and day count in weekly target popup
Each week reads like "11/1(일)~11/8(일) 8일".

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 11:30:49 +09:00
king cd3577b299 feat(project): month-bounded meeting weeks, weekly sales targets, sticky header
- Weeks stay inside the month: week 1 starts on the 1st (through the next
  Sunday if the 1st is a weekend); a trailing Mon/Tue joins the last week.
  "Last week" is the previous period.
- Prev-week review columns: 전주 업무 | 결과(text, new result_note) |
  전주 목표 | 결과(amount).
- Header now shows month target, cumulative weekly target, month-to-date
  sales and gap (amount + %), with decisions/notes beside it; the area
  stays fixed while scrolling.
- Goals board: the monthly sales target is entered per week; the sum
  becomes the month target.
- Migration 020: result_note, goal_week_targets, drop Monday-only check,
  move absorbed Monday meetings to the new week start.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 11:24:41 +09:00
king e958743e65 feat(project): rename meeting columns and drop rate/evaluation
Headers: 주요 업무 / 결과 / 전주 목표 / 정량 목표. The achievement-rate
and evaluation columns are removed from the weekly meeting table.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-06 17:27:04 +09:00
king 39dcda66b4 feat(project): remove per-row this-week sales in weekly meetings
Drop the "이번주 실적" line under each row's target and the now-unused
shop link menu. Performance sales stay only in the header cards.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-06 16:01:47 +09:00
king df36a5a917 feat(project): drop auto last-week results in weekly meetings
Last-week result is always entered by hand; remove shop sales auto-fill
and the 자동입력 / 실적 미사용 badges next to item names. This-week sales
under the target stay.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-06 15:52:05 +09:00
king d18e801e08 feat(asset): animate asset detail drawer 2026-10-06 02:39:03 +09:00
king b576dd1a38 feat(asset): add photos, monitor links and deletion
Apply asset_db_002_photos_monitors.sql before rebuilding web.

Restrict soft deletion to the super admin; retain reports and audit.
2026-10-06 02:29:19 +09:00
king bd0c47e6fc feat(asset): add inventory and HWiNFO reports
Requires asset_db initialized with scripts/sql/asset_db_init.sql and ASSET_DB_URL configured before enabling storage.
2026-10-06 02:09:10 +09:00
king a2a39671b9 feat(project): collapse meeting months by year 2026-10-04 14:40:58 +09:00
king 2a1a3e7bd9 fix(project): keep sidebar on week navigation 2026-10-04 14:14:25 +09:00
king 5bf8c9c160 feat(project): add monthly meeting menu tree 2026-10-04 13:45:22 +09:00
king 86622cc4dd fix(project): retain monthly plan text styles 2026-10-04 13:30:36 +09:00
king ed7da57066 feat(project): compact links and add file icons 2026-10-04 13:17:22 +09:00
king e2fc14a584 fix(project): center weekly meeting labels 2026-10-03 18:45:27 +09:00
king d89875db7e fix(project): restore smooth quarter toggles
Hide monthly content until column widths settle to prevent numeric shifts during expansion.
2026-10-03 18:09:10 +09:00
king 321bf11f65 fix(project): stop quarter reveal numeric drift 2026-10-03 17:53:16 +09:00
king d3c1ca12e9 fix(project): grow cells and repair Enter 2026-10-03 17:04:02 +09:00
king 090e508bf3 feat(project): add meeting cell editing
Apply project_db migration 019 to enable vertical cell merges. Other cell editing remains available before migration.
2026-10-03 15:11:41 +09:00
king 193da56edf fix(project): fit meeting rows and inline badges 2026-10-03 14:26:36 +09:00
king cd0a509215 feat(project): add help search and detailed guides 2026-10-03 09:41:09 +09:00
king 7647e4b20f feat(project): add cell moves and width menus 2026-10-03 08:55:15 +09:00
king 2c8542339d fix(project): fit goal rows to text height 2026-10-03 07:59:22 +09:00
king b32f2ac3a3 feat(project): auto-fit goal column widths 2026-10-03 06:55:00 +09:00
king e726f986db perf(project): smooth sidebar resizing
Batch drag updates per frame and defer full layout recalculation until release. Cover resize edge cases and retain goals review records.
2026-10-03 06:45:56 +09:00
king dc2008c5b3 feat(project): add Excel font controls and reflow 2026-10-03 05:47:57 +09:00
king 494d84f7c2 feat(project): add group collapse and UI polish 2026-10-03 05:26:41 +09:00
king 22af196d56 feat(project): add Asana-style board completion checks 2026-10-02 17:55:31 +09:00
king 20232baf06 feat(project): add font options and selected goal text formatting
Restore the board header add button to the task side panel while keeping footer quick entry. Add safe, persisted goal text formatting and self-hosted Project font preferences with shared help updates and regression coverage.
2026-10-02 17:28:54 +09:00
king 035cb83d6f feat(project): add inline board tasks and reorder subtasks 2026-10-02 16:38:01 +09:00
king d21670f6af feat(cupang): 출고 상세 상자 목록에 상자별 무게 합계
- 상자마다 무게 칸 = 상자에 든 제품 수량 × 포장무게(설정(제품명)의 지금 값) 합계, 상자번호처럼 상자 단위 한 칸
- 무게가 없는 제품이 섞이면 아는 무게만 더하고 "일부 미입력"(말풍선에 빠진 코드), 모두 없으면 —
- 상자 목록 엑셀에도 무게(g) 열(혼합 상자는 세로 병합)
- 포장무게 칸(마이그레이션 007)이 없으면 무게 칸·열 없이 예전 그대로
- tests/test_cupang_weight.py: 상자 무게 계산 + 엑셀 무게 열

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-02 14:23:56 +09:00
king f02742497a feat(cupang): 제품 설정에 포장무게(g) — 수기 추가·수정 입력, 목록 표시·정렬
- cupang_products.weight_g (마이그레이션 007, NULL = 미입력, 0~1,000,000 CHECK)
- 초기 무게 39건 시드(cupang_products_weight_seed.sql) — 무게가 비어 있는 행만 채움, 실행 전 값 백업
- 수기 추가에 포장무게(g) 칸(1,070·1070g 허용, 비우면 기존 무게 유지), 수정 팝업에서 수정·지우기
- 등록 목록에 포장무게 열(1,070g, 숫자 정렬, 무게 없는 줄은 맨 뒤)
- 007 미적용이면 무게 칸·열을 숨기고 저장 SQL 에서도 뺌(기존 동작 그대로)
- tests/test_cupang_weight.py: 입력 읽기 + 무게 칸 유무별 등록·수정 SQL

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-02 13:43:17 +09:00
king e1006c63de fix(project): 목표·주간 회의록 저장 손실·지난주 연결·실적 미확인 수정 (점검 9건)
- 칸별 자동 저장 createFieldSaver: 같은 칸 요청 직렬화, 보낸 값만 saved,
  늦은 응답이 새 초안을 덮지 않음, 실패 시 초안·dirty 유지(빨간 테두리),
  localStorage 초안 백업·되살리기, 페이지 떠남 keepalive + 이탈 경고
- 목표 표: 저장 실패면 영역·줄·병합 작업과 표 교체 중단, 받는 사이 입력 보호
- 회의록: 금주 목표 저장 뒤 새로고침 대신 숫자 칸만 다시(차례 번호로 옛 응답 버림),
  이번주 실적 %는 서버 확정 목표로 즉시 재계산
- 지난주 = 정확히 7일 전 주의 같은 연결키 줄(line_key, 마이그레이션 018),
  역순 생성·이름 변경·삭제 후 재생성에도 연결, 이름 추정 연결 없음
- 실적 조회 장애를 0원 대신 미확인으로(목록·매출·부분 실패 구분)
- 구역·항목 ⋮ 메뉴 버튼(키보드·터치), 메뉴 키보드 탐색·포커스 복귀
- 매출 갱신 실패·일부 실패 안내 + 재시도, 서버 기록 갱신 시각, 권한 없으면 호출 안 함
- 테스트: Python 통합(역순 생성·실적 장애), 018 백필, jsdom UI 106건

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 21:14:10 +09:00
king 51727e419a feat(project): 연간 목표 상·하반기 → 1~4분기, 주간 회의록 머리·표 다듬기
연간 목표 표
- 3·6·9·12월 오른쪽에 1~4분기 칸(글 칸 13=1분기·15=2분기·14=3분기·16=4분기 — 예전 반기 칸 번호를 이어 써서
  글 옮기기 없음, 예전 상반기 글은 1분기·하반기 글은 3분기에 보임)
- 분기 합계·달성률·로아스 가중 평균, 분기 접기(pj_goal_fold_q), 열 너비 키 q1~q4
- 가로 병합은 같은 분기 월 칸 안에서만(서버·화면·DB CHECK), 분기를 넘는 예전 병합은 잘라서 그림
- 마이그레이션 017: goal_cells 월 칸 0~16, 분기를 넘는 병합은 분기 끝까지로 줄임(글 유지),
  회의록 줄 이름 "메타(숫자)" → "메타". 미적용이면 2·4분기 칸 읽기 전용 + 503

주간 회의록
- 달력 폭 줄이고(174px) 글자·칸 5% 키움, 주차 탭은 달력 바로 왼쪽
- 지난주 리뷰 머리에 지난주 기간, "목표 금액" → "정량 목표", "목표 표에서 보기" 삭제
- 첫 회의록 기본 줄 "메타(숫자)" → "메타"

도움말·문서·테스트 갱신, project.css/js 캐시 버전 올림

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 16:30:24 +09:00
king 164153dc9c feat(project): 목표 표 3열에서 줄 추가 = 같은 항목 칸(2열) 안에 — 항목 칸 묶음
- goal_rows.label_cont(마이그레이션 016): 바로 위 줄 항목 칸에 묶임, 이름은 묶음 첫 줄, 2열 rowspan(_goal_label_spans)
- 3열 우클릭 위/아래에 줄 추가 → same_label: 같은 항목 칸 안(이름 묻지 않음), 첫 줄 위면 새 줄이 첫 줄로 이름 넘겨받음
- 2열 메뉴·+ 줄 추가는 묶음 밖(묶음 맨 위/맨 아래 기준), 묶인 2열 우클릭 → 항목 칸 나누기(split-label)
- 묶음 첫 줄 삭제 → 다음 줄이 첫 줄·이름 넘겨받음, 묶인 줄 이동 400, 새 연도 복사에 묶음 유지
- 캐시 버전 20261001k, DB 회귀 test_goal_label_groups, 문서 갱신

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 13:37:40 +09:00
king c9bce7c976 feat(project): 연간 목표 엑셀식 칸 병합(끌어 고르기·우클릭 병합/해제) + 월별 주간 회의록
엑셀식 칸 병합 (예전 Shift+클릭·병합 버튼·오른쪽/왼쪽 칸 병합 메뉴 대체)
- 글 칸을 마우스로 끌어(또는 Shift+클릭) 사각형 선택 → 우클릭 "셀 병합 (N줄 × M칸)" / "병합 해제"
- 같은 업무 영역 안 세로(row_span) + 같은 반기 월 칸 가로, 연간·상·하반기 칸은 세로로만
- 걸친 병합은 엑셀처럼 범위를 넓혀 흡수, 글은 왼쪽 위부터 이어 왼쪽 위 칸에, 해제하면 왼쪽 위 칸에 남음
- POST /api/goals/areas/{id}/merge {row_from,row_to,col_from,col_to} (db.merge_goal_rect), router._goal_area_layout(colspan·rowspan)
- 가려진 칸 저장 거절(세로 포함), 병합 안쪽 줄 끼우기 +1 / 가려진 줄 지우기 -1, 세로 병합에 걸린 줄 이동 거절

주간 회의록 (/project/goals/{연도}/meetings/{월}, 목표 표 월 머리 클릭)
- 주(월~일) 탭, 주마다 회의록: 이번주 할 일·목표 금액 | 지난주 할 일·목표·결과·달성률·평가
- 앞선 회의록 줄 이어받기(carry_from), 처음이면 목표 표 업무 영역 + 기본 양식 줄(유통 줄 쇼핑몰 연결 추측)
- 머리: 월 목표·지난주까지 누적·주당 필요 매출(페이싱)·전주 목표/결과/달성률·금주 목표/현재 실적
- 쇼핑몰 연결 줄의 결과·누적·주간 매출은 실적 모듈 performance_store 읽기 전용(없으면 직접 입력)
- 금액 입력 120만·1.5억·3천만·1억2천만, 참석자·결정 사항 메모, 줄 메뉴(추가·순서·쇼핑몰 연결·삭제), 인쇄

마이그레이션 015(project_db): goal_cell_merges.row_span + CHECK 교체, goal_meetings, goal_meeting_items
캐시 버전 20261001c, 테스트(DB 회귀 test_goal_rect_merges·test_goal_meetings)·문서 갱신

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 11:46:25 +09:00
king d3761183c3 feat(project): 연간 목표 모든 열 너비 조절·지표 줄 틀 고정·항목 줄 위/아래 추가·삭제
- 연간·1~12월·상/하반기 열도 머리 칸 오른쪽 끝을 끌어 너비 조절(더블클릭 = 기본), localStorage pj_goal_col_w
  에 기본값과 다른 칸만 저장. 반기 접기 애니메이션의 안쪽 고정 폭은 --fold-w(병합 칸 = 걸친 월 너비 합)
- 세로 스크롤 틀 고정: 머리 줄 + 매출·로아스 지표 줄까지 sticky(줄마다 --kpi-top, stickKpi)
- 항목 칸 도구 막대에 + (아래에 줄 추가) 항상 표시, 우클릭 메뉴로 위/아래 줄 추가·줄 삭제
- POST /api/goals/areas/{id}/rows 에 ref_row_id·place(above|below) — 기준 줄 위/아래에 넣고 순서 다시 매김
- project.css/js 캐시 버전 20261001b, 문서·회귀 테스트 갱신

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 09:11:55 +09:00
king 5d07770ce2 feat(project): 연간 목표 상·하반기 칸·반기 접기·이름 바로 수정·월 칸 병합·로아스 %
- 6월·12월 오른쪽에 상반기·하반기 칸 추가. 매출 목표·실적은 반기 합계,
  달성률은 연간과 같은 규칙, 업무 영역 글 칸은 month 13·14 로 저장
- 반기 칸 머리 버튼으로 1~6월 / 7~12월 칸을 접었다 펴기(너비 애니메이션,
  localStorage pj_goal_fold). 표를 width:1px + table-layout:fixed 로 바꿔
  펼칠 때도 애니메이션이 적용되게 함
- 업무 영역·줄 이름을 눌러 그 자리에서 수정(✎ 버튼 제거)
- 월 칸 가로 병합(goal_cell_merges, 반기 안에서만): Shift+클릭 선택 후
  병합 버튼, 우클릭 메뉴로 좌/우 병합·해제. 병합 시 글은 월 순서대로 첫 칸에 모음
- 로아스 목표·실적 칸 % 표기
- 마이그레이션 014 (goal_cells month CHECK 0~14, goal_cell_merges)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 08:24:13 +09:00
king 91bdc12e78 chore(cafe24): 정리 전 완료된 작업 보존
Cafe24 수정, 테스트 및 DB 마이그레이션 파일을 함께 기록한다.
2026-10-01 02:29:19 +09:00
king 81b1204693 fix(project): 권한 우회·작업 혼선·저장 유실 등 16개 항목 수정 — 지금 권한 기준·읽기 전용 연결 작업·원자적 파일 댓글
권한(서버)
- 공통 권한 모듈 access.py: 모든 판단을 "지금" 권한으로 — 내 작업·수신함·알림·멘션·검색·상세·공유 링크·
  댓글·첨부·알림/메일 수신자에서 권한을 잃은 사람 제외(기록은 이력으로 보존)
- 소유자 변경·남을 소유자로 지정한 생성은 관리자만, 새 소유자는 권한 있는 등록 사용자
- 삭제는 생성자 규칙 + 지금 권한(멤버에서 빠진 생성자 거절), 댓글 수정·삭제도 지금 권한
- @태그는 볼 수 있는 사람만(mention_skipped), 태그 후보 all-users?task_id=, 새 담당자 권한 검사
- 연결(멀티호밍) 작업은 연결된 프로젝트 멤버에게 읽기 전용(task_link_scope), 볼 수 없는 연결 프로젝트 숨김

저장·동기화(화면)
- 작업 창 세대(taskGen)·블록 ctxSeq 로 늦은 A 응답이 B 를 덮지 않게(A→B, A→B→A, 이미지 업로드 중 전환)
- 자동 저장 성공/실패 반환, 실패 칸 재시도, 닫기·전환 전 저장 확인(버리기/계속 편집), 미저장 이탈 경고
- 실시간 동기화 observed/applied 분리·실패 재시도·겹침 방지, snapshot?scope=all 로 전체 범위 반영·권한 회수 안내
- 한국시간 기준 오늘(kstTodayIso), 한글 조합 중 Enter 는 제출하지 않음, 댓글 연타·재전송 중복 방지(client_token)

기타
- 파일 댓글은 본문+파일 한 트랜잭션(POST /comments/files), 실패 파일 표시·유지, 작업 창 댓글에 첨부 표시
- 날짜 범위 검증(부분 수정은 최종 상태), 완료 섹션에 바로 만든 작업 완료 처리·알림
- 마감 알림 발송 기록+수신함 알림 원자적(실패 시 재시도), 권한 없는 수신자 제외
- 테스트: tests/test_project_module.py(로컬 PostgreSQL 11개), tests/js/project_ui.test.js(jsdom 51개)
- 문서(PROJECT_MODULE 6-10·도움말·CLAUDE.md), project.js/css 캐시 버전 20260930g, 새 마이그레이션·환경변수 없음

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-30 16:46:11 +09:00